Skip to content

Notre Dame du Pilier

Manufacture Mayaud

750/1000 Gold & Mother-of-Pearl
Regular price 465,00 €

Unit price per 

Medal diameter:

Availability: made within 2 to 3 days.
Our Gold & Mother-of-Pearl medals are crafted to measure in our Paris workshop, just for you!

Notre Dame du Pilier is a christening medal in mother-of-pearl and 18-karat gold that takes up the official Virgin and Child of Notre-Dame de Paris, the statue of the pillar, before a rose window engraved in the mother-of-pearl.

The Virgin of the pillar before the rose window

Mary crowned, standing, a veil resting on her hair, holds the Child nestled on her arm, who turns towards her; her tunic falls in long folds. This is the Virgin of the pillar of Notre-Dame de Paris, a fourteenth-century statue standing at the crossing of the transept, before which Parisians have prayed for centuries and which came through the fire of 2019. Behind her, a Gothic rose window, engraved in fine tracery in the jewellery-grade mother-of-pearl, as if the statue stood before the stained glass. The gold rim closes the rose.

Jewellery-grade mother-of-pearl, rimmed in 18-karat gold

Natural extra-white mother-of-pearl of jewellery grade, carved in our workshop and set in an 18-karat yellow gold rim, bail included, from 1.40 g of gold in 20 mm to 1.60 g in 24 mm. Rim in polished finish. Made to order in our Paris workshop, within 2 to 3 days.

Diameters and variations

Offered in 20, 22 and 24 mm: the 20 mm for a christening, the 22 mm for everyday wear, the 24 mm as a pendant. Notre Dame du Pilier is also available without the rose window, on a smooth mother-of-pearl background, to be worn on an 18-karat yellow gold trace chain.

  • Precious metal: Mother-of-Pearl & 18-karat Yellow Gold
  • Precious metal weight: 1.40g of gold (20mm), 1.50g of gold (22mm), 1.60g of gold (24mm) and 1.70g of gold (26mm)
  • Finish: Polished
  • Production time (if out of stock): 2 to 3 days
  • Made in: France (100%)
Close (esc)

Summer at the Workshop

Our creations continue to be carefully crafted throughout the season.

Some pieces take time: cutting, fitting, engraving, polishing… every step matters. With the summer holidays, some lead times may be slightly longer, and certain productions, notably rings, will resume from September.

The Paris boutique and the workshop will be closed from 11 to 15 August.

Orders placed on the website between 8 August and 16 August will be shipped from 17 August.

Outside these dates, the boutique welcomes you from Tuesday to Saturday, from 10:30 am to 1:30 pm and from 2:30 pm to 7 pm.

Thank you for your patience and your trust.

Age verification

By clicking enter you are verifying that you are old enough to consume alcohol.

Search

Shopping Cart